DLA Images

New DLA Energy pipeline fortifies fuel readiness at MacDill
Contractors use multiple excavators with straps to carefully guide a section of new Flexsteel pipe into a trench near Defense Fuel Support Point Tampa. Due to the pipe's rigidity, heavy machinery is required to manipulate the continuous lengths and position them for installation without causing damage. (DLA Energy photo courtesy of John Sprenkle)

Photo by: Stephanie P. Abdullah |  VIRIN: 260427-A-SO478-7466.JPG