Search DLA News

Results:
Tag: USACE

Jan. 8, 2018

USACE Quality Assurance checks help keep temporary emergency generators running strong in Puerto Rico

Logistics In Action: Article originally appeared on the U.S. Army Corps of Engineers website — Shelby Deal leans over a generator hooked up to a water pump station on the side of a twisting mountain road in central Puerto Rico. He notes the generator’s barcode and transponder number, inspects its oil and fuel filters, checks the fuel gauge, and records the number of hours the generator has operated.

Oct. 27, 2017

Overcoming Alaskan-sized challenges to provide energy assurance

Logistics In Action: Article originally appeared on the U.S. Air Force Civil Engineer Center website — Preparing for a major power outage or planning a backup generation exercise is complicated in the best conditions. Now, imagine doing it in temperatures as low as 50 degrees below zero at Clear Air Force Station, Alaska.

Oct. 10, 2017

Agency’s first forum with Corps of Engineers proves successful

The director of the Defense Logistics Agency welcomed leaders from the U.S. Army Corps of Engineers leaders to the inaugural USACE/DLA Day at the McNamara Headquarters Complex Sept. 28, to explore mutual goals and capabilities.

Sept. 8, 2017

Workshop explores ways to maximize savings under ESPC

Logistics In Action: Article originally appeared on the U.S. Army Corps of Engineers website — More than 50 government and industry representatives converged at the Bevill Center at the University of Alabama Huntsville Aug. 29 for the first Energy Savings Performance Contracting Measurement and Verification Workshop.

Aug. 22, 2017

3-D printing a building

Logistics In Action: Article originally appeared on the U.S. Army Engineer Research and Development Center website — The Construction Engineering Research Laboratory in Champaign, Illinois, has successfully three-dimensionally printed a 512 square-foot concrete structure.

June 23, 2017

Phase II increases Fort Campbell solar array wattage

Logistics In Action: Article originally appeared on the U.S. Army Engineering and Support Center, Huntsville website — A ribbon-cutting ceremony June 9 at Fort Campbell, Kentucky, celebrated the completion of the final phase of Fort Campbell’s 5 megawatt solar array.

Jan. 27, 2017

ERDC named to Million Dollar Board

Logistics In Action: Article originally appeared on the U.S. Army Engineer Research and Development Center website — The U.S. Army Engineer Research and Development Center has recently been named by the Department of the Army’s Defense Logistics Agency for Disposition Services to the Army’s Million Dollar Board.

Aug. 3, 2015

Crane delivery helps lift support to USACE in Northwest

Defense Logistics Agency Troop Support Pacific recently provided the muscle for heavy lifting required to help maintain the Albeni Falls Dam in Idaho.

July 28, 2015

Crane delivery helps lift support to USACE in Northwest

DLA Troop Support Pacific recently provided the muscle for the heavy lifting required to help maintain the Albeni Falls Dam in Idaho.